Location: Penhurst, NSW
Mechanical Consultant: Evolved Engineering Pty Ltd
Contractor: Air Focus Pty Ltd
The physical transformation of the College site since 2014 has been significant. Stage 4 includes the expansion of TAS and a large multi-purpose gathering space.
The multipurpose hall required the fresh air provision that is supplied and conditioned by 2 units each with 3500 l/sec capacity and 74 kW capacity.
A little extra engineering went into the design so that the condensed air could be top discharge and both units with access from either side to match the building configuration.
All this is possible when the equipment is locally designed and built. Custom configuration is part of the service that makes Armcor the preferred equipment manufacturer for Australian projects.