Location: Derrimut, VIC
Mechanical Consultant: AE Smith VIC
Contractor: AE Smith VIC
When the design stipulates that the air conditioning equipment is not to provide comfort conditions, just to temper the outside air, this does not lessen the need for careful selection and design.
Data centres have specific cooling requirements, but the introduction of fresh air is also essential for occupancy and maintenance personnel and this requires the fresh air treatment.
The Metronode Data Centre had the requirement for two roof mounted DX ERV units that could supply 1200 and 1500 l/sec of fresh air. The equipment contained digital compressors and electronic expansion valves to optimise efficiency.
If you are needing assistance with Data centre equipment, Armcor has the experience to support you.
Click Here to view Equipment Installed on this Project