Location: Merewether, NSW
Contractor: McIntosh Airconditioning Distribution Pty Ltd
Lingard Day Centre is located directly opposite from Lingard Private Hospital. The new facility offers 4 operating theatres, 2 endoscopy suites, 24 recovery bays and a multi-level carpark with 130 car spaces.
Lingard Day Centre is an extension of Lingard Private Hospital, a facility purpose-built to efficiently cater for high volumes of patients, all the while providing a superior patient experience. With a 23-hour licence the facility can care for patients overnight where necessary.
Lingard Day Centre offers surgeons cutting-edge surgical equipment, providing patients with less invasive procedures, reduced risks, and reduced recovery time. The patients and surgeons are supported by our experienced nursing and administration team who are committed to the very best in patient care.
The contractor approached Armcor Air Solutions for providing economical and practical solution for temperature and humidity control for the operating theatre unit at the new State-of-the-art day centre. With a nominal capacity of 650 l/sec, including one BLDC Invertor compressor and cooling capacity of 35 Kw, HTC900P3 was put into production.
The HTC series are packaged Humidity and Temperature Control units designed to provide a practical solution for temperature and humidity control where there is a significant requirement for fresh air. This project had a strict deadline for delivery. This “Australian Made” unit was manufactured, assembled, and delivered within the required time frame.