Location: Greensborough, VIC
Mechanical Consultant: NDY
Contractor: All State Air
To be involved in a local project is always a great feeling. When the Greensborough Plaza refurbishment of the restaurant precinct began, Armcor was very keen to work with the installing contractor to provide the seven Air Handling Units for the project. All with 75mm thick panel, AC Plug fans, chilled and hot water coils and F5 bag filters, the manufacturing process was very smooth. The equipment capacities ranged from 1250 l/sec to 5200 l/sec with five units located externally on the rooftop and four units located in the level 3 plantroom. With the project only minutes away from the Armcor manufacturing facility, we were able to deliver to site effortlessly and of course, on time.