Location: Boronia, VIC
Mechanical Consultant: NJM Design
Contractor: Essential Airconditioning
The Melbourne Eastern Private Hospital is undergoing renovation including a new wing that will offer Inpatient and Outpatient Rehabilitation Services with a fully equipment swimming pool and gymnasium area along with an increase of 33 beds.
The Hydrotherapy pool area required a packaged roof top reverse cycle Air-conditioning unit with heat recovery and EC Plug fans to provide the fresh air to effectively condition the surrounds. A standard Armcor XEP1500P3 fitted the specification with 30kW capacity. With epoxy coating to combat the corrosive elements associated with a pool environment, Armcor provided the equipment on time to assist the contractor with minimal site installation time.
Click Here to View Equipment Installed on this Project