All Projects, Education

Newhaven College Performing Arts Centre

All Projects, Education

Newhaven College Performing Arts Centre

All Projects, Education

Newhaven College Performing Arts Centre

All Projects, Education

Newhaven College Performing Arts Centre

Location: Rhyll VIC 3923
Mechanical Consultant: Intrax Consulting Group
Contractor: Williams & Burns Contracting P/L

The new performing arts wing at Newhaven College is well underway and due for its planned completion in late October in 2021. The planning for this building has taken several years and is one of the most exciting builds that the College has undertaken. This building will include a Concert Rehearsal Hall, a 120 seat Black Box Theatre, a state-of-the-art Recording Studio, and several classrooms for class music and private instrumental lessons. The external façade will also provide shelter for those waiting for buses in inclement weather. It will be Stage One of a two-part build, which in the future will see the addition of a large auditorium with a full stage. Newhaven College business manager Stuart Robinson said everyone at the school was looking forward to seeing the space open.

Armcor Air Solutions is proud to be associated with Williams & Burns Contracting P/L to provide the Newhaven College’s State-of-the-Art Performing Arts wing its best design and engineering solutions with the XEP Packaged Air Conditioning Range. With the Capacity of 900 l/sec and 1700 l/sec Armcor provided its economy cycle units of XEP900P3E-EC and XEP1700P3E-EC respectively. These units have energy-saving EC Plug Fan, enthalpy heat exchange media along with its standard inclusions.

These units are best suited to provide a comprehensive solution to temperature control for applications that require substantial or full fresh air. Armcor delivering Fresh Air Solutions.