Location: Mango Hill, QLD
Contractor: Aston Air Conditioning & Refrigeration (68 PL)
Mango Hill State Secondary College is a future-focussed learning community, committed to advancing the individual potential of each child in an innovative, supportive and collaborative learning environment. The college is located in the fast-growing area of Mango Hill in the Moreton Bay region. Mango Hill State Secondary College – Stage 2 is a construction project based in Mango Hill QLD within the Commercial sector. The project has an approximate budget of $15m – $20m.
Mango Hill State Secondary College Stage 2 will deliver junior and senior science, technology, engineering and mathematics (STEM) centres, a food and hospitality centre, an art and design centre, a senior learning centre and a performing arts centre.
Armcor Air Solutions collaborated with the contractor to provide our standard heat recovery ERV solution. Armcor’s XEM series utilizes the Xchange plate heat exchanger to recover the energy from the exhaust air and transfer it to the incoming fresh air, resulting in significant energy savings. XEM2500P3 with a capacity of 2000l/sec and standard inclusion of Enthalpy Heat exchange Media with EC plug fans was slotted into the production schedule.
These EC Plug fans are standard on all models, providing variable speed control and optimal energy efficiency.
Armcor fulfills its promise by delivering not only a state-of-the-art energy efficient equipment but also proudly delivers a hassle free project.