All Projects, Essential Services, Food Processing

Fangs Chilli Sauce

Location: Portsmith, QLD
Mechanical Consultant: WSP

Fangs Chilli Sauce is establishing a new plant in Cairns QLD and required an air-conditioning system that will operate 24/7, incorporating EPA filtration systems, humidity control, room pressurisation and make up air to Clean Room 1 and Clean Room 2.  With a low load requirement of 720 l/sec, 11.9 kW and a high load requirement of 2185 l/sec, 50.3 kW, the solution was to select an Armcor XC2000 external mount PAC with dual compressors, split condenser coils, electric reheat elements and variable speed fans.  Armcor Air Solutions was pleased to supply another well-known Australian producer with equipment to service their specific requirements.