AG Coombs, Mechanical Services Contractor for this project, chose Armcor’s INDEC Indirect Evaporative Cooling combined with a DX cooling system, to meet the specifications and requirements for this project.

Available in unit sizes from 1000l/sec to 12,000 l/sec, INDEC is ideal for fresh air stand-alone solutions or for pre-cooling fresh air to reduce the load and operating costs of refrigerated systems.

Click the link on the right to view the full case study.